13.09.2011
intralogistic system
Axmann has been chosen as key supplier for the new intralogistic system at the Bosch plant in Karlsruhe. This system was designed to guaranty a high throughput of 900 boxes per hour with belt conveyors, belt curves and Axmann univeyors. Axmann thanks for the trust in our products and services.
23.08.2011
Zalando retour line
The Zalando logistic key supplier docdata rely on Axmann to install the first Zalando retour line nearby Berlin. This line is characterized by a throughput of 1.500 parcels per hour as well as 24 Pick and Place stations and is based on a combination of belt conveyors, belt curves and Axmann univeyors.
23.07.2011
dishwasher assembly line
At the end of the year Axmann installs a dishwasher assembly lineat the V-Zug plant in Switzerland. This assembly line is based on the Axmann assembly line program.
04.07.2011
marriage station at the Seat plant in Martorell
At the beginning of 2012 Axmann expands under the general contractor Thyssen Krupp the existing marriage station at the Seat plant in Martorell, Spain. Beside the standard VW-components like chain conveyor, the storemove large stacker crane is used as buffer for the 2000 kg assembly frame.
29.06.2011
vacuum cleaner assembly line
After the successful production start of one vacuum cleaner assembly line in 2010. The costumer now decided to insrtall an second line together with Axmann Fördersysteme and Axmann Technology. Beside the assembly line an robot application for packaging is included in this line.
22.02.2011
ProMat 2011
From March 21 - 24, 2011 the material handling and logistics industry was showcase the latest manufacturing, distribution and supply chain solutions at ProMat 2011. We thank all visitors for the pleasant conversations.
12.02.2011
LogiMAT 2011
Axmann Fördersysteme GmbH presented itself successfully at the trade fair LogiMAT in Stuttgart. We thank all visitors for the pleasant conversations and hope for a further successful cooperation.
